If like myself you work in the PCB industry, there’s a good chance you’ve heard conversations about material availability, lead times and increasing costs.
What was once something largely associated with specialist materials and high-performance laminates is now becoming a much wider concern. Even standard FR-4 materials are feeling the pressure, with manufacturers reporting shortages, longer lead times and difficulties securing certain materials.
So, what does this mean for PCB designers, and is there anything we can do to make life a little easier?
What’s causing the problem?
There isn’t just one reason behind the current situation.
The growth of AI, data centres and high-performance computing has created enormous demand for advanced PCB materials. These applications often require complex multilayer constructions and specialist laminates, putting additional pressure on material suppliers.
At the same time, the supply of some of the raw materials used to manufacture PCBs, including laminates, prepreg and copper foil, has also become more challenging.
The knock-on effect is being felt across the industry. Material prices are increasing, lead times are becoming less predictable, and some suppliers are introducing restrictions on what manufacturers can purchase.
According to industry reports, this pressure has now extended into standard FR-4, with some manufacturers facing allocation restrictions based on their historical purchasing volumes.
For PCB manufacturers, this creates an obvious problem. Having the manufacturing capacity to build a board doesn’t necessarily mean having the materials available to build it.
What does this mean for PCB designers?
This is where things get interesting.
When designing a PCB, we naturally focus on the requirements of the board itself. Electrical performance, impedance, layer count, thickness, copper weights and thermal requirements all play a part in determining the stackup.
But how often do we consider whether the material we’ve selected will be available when the board goes into production?
A particular laminate or prepreg might be perfectly suitable from an electrical perspective, but if the fabricator cannot obtain it within the required timeframe, the design could suddenly become a problem.
And changing materials isn’t always as simple as swapping one product for another.
Different laminates can have different dielectric properties, resin characteristics and available thicknesses. Even materials with similar dielectric constants can behave differently depending on their construction and the frequencies involved.
For controlled impedance designs, changing the material or dielectric thickness can mean revisiting the stackup and recalculating impedance.
What initially looks like a purchasing issue can quickly become an engineering issue.
Can you simply use another material?
Sometimes, yes. But it needs to be considered properly.
There may be alternative materials that can achieve the same electrical and manufacturing requirements, potentially giving the fabricator more flexibility when sourcing materials.
However, it’s important to understand what matters in the original design.
Is the dielectric constant critical? Is a particular thickness required? Are there thermal or reliability requirements that need to be maintained? Could a different prepreg construction achieve the same result?
These are the sorts of questions worth asking before a design is released, rather than trying to answer them when production is already waiting.
This is also where a certain tool could be very beneficial… hint hint 😊
Perhaps we need to think about stackups a little differently?
Traditionally, stackup development has often been driven by electrical requirements and the desired finished board thickness.
But with material availability becoming increasingly unpredictable, perhaps it’s worth considering whether we should be looking at alternative constructions earlier in the design process.
That doesn’t mean designing around compromises or reducing performance requirements.
It simply means understanding which materials and constructions are essential, and where there might be some flexibility.
For example, if a particular prepreg isn’t available, could another construction achieve the same dielectric thickness and impedance requirements? If a preferred laminate is difficult to source, are there other suitable materials that could be considered?
Having those options available before manufacturing begins could make a significant difference.
Where does PCB Starting Point fit into this?
One of the things we’ve been working on with PCB Starting Point is making material information and stackup development easier to access.
Our material library brings together a wide range of laminate and prepreg information, allowing engineers to explore different materials and constructions without having to start from scratch every time.
Combined with stackup development and impedance calculation tools, the aim is to make it easier to understand how different material choices affect the resulting PCB construction.
We’re not suggesting that software can solve material shortages. Nobody can do that.
But having better access to material information, and being able to explore alternative constructions more easily, can certainly help when those challenges arise.
A little more thought at the beginning can save a lot of trouble later
Material availability is something that PCB designers and fabricators may need to consider more carefully going forward.
The days of assuming that every specified material will always be readily available may be becoming a little less certain.
Understanding your materials, considering suitable alternatives and involving the fabricator earlier in the process could help avoid unnecessary delays and redesigns.
And ultimately, that’s what PCB Starting Point is about.
Helping engineers make better-informed decisions before their PCB reaches manufacturing.